Utility Installation

Wow, this has been a long time coming.

Finally. We. Have. Power.

The only time this meter will show all zeroes

I won’t go into the harrowing and horrific story of why our journey to get power took so long (almost 8 full months), but I will say that I won’t look at some neighbors the same way again. But in the end, we have power running to the house…

Once the A/C guys arrived, the air conditioning began – a necessary step before hard wood flooring arrives to get acclimated later this week…

Electricity was also run to the water well pump and to the barn.

In addition to getting electricity, we also had our liquid propane tank installed and buried.

With utilities installed, the rest of the house can be finished and our builder says we will be done and ready to turn our construction loan into a home mortgage in August. Hooray!!

The meter is already running!

Thanks for stopping by and we hope you are all staying safe and healthy.

Hugs, Libby

4 Replies to “Utility Installation”

Leave a Reply

Your email address will not be published. Required fields are marked *